Seminole Services installs first Powerscrew Liner System!

Catoosa Well, Lucy 6G; Hallet OK….Seminole Services successfully installed a 7-5/8 39lb liner inside a 9-5/8 32.3lb intermediate casing string after reaming the liner to total depth.  A rotating cement head was utilized during the job to better facilitate the cementing operation.  The liner top was forged downhole through the use of a unique helical stretch forming technique that utilizes torsional energy from the top drive.  With a drop in torque, the liner top was fully integrated into the 9-5/8 casing and the setting tool retrieved from the well.  A perfect first run!

Posted in News.

Leave a Reply

Your email address will not be published. Required fields are marked *